Wayfair

Industrial

Project Details

Visit BDO Website 106,512 SF
550 South Depot Drive, Ogden, UT
Project Managers: Cameron Cook, Aaron Austad

Project Description

Building 550 is a 106,512 square foot concrete tilt up building, constructed on a 6” reinforced concrete slab, has a 28’ clear ceiling height and column spacing of 52’ X 54’. This building is also served by an ESFR sprinkler system. This rear-load building has a total of 15 dock high doors and 2 ground level doors. Lighting, offices and restrooms would be tenant finish items and would be designed to meet the specific needs of the tenant. Vehicle parking and truck/trailer staging at this site would accommodate the tenant’s needs.