BDO 977

Building 977 is an 86,085-square-foot building, completed in 2023. This concrete tilt up building, constructed on a 6” reinforced concrete slab, has a 32’ clear ceiling height and column spacing of 60’x50’. It is served by an ESFR sprinkler system. This rear-load building has a total of 23 dock high doors. Lighting, offices and restrooms would be tenant finish items and would be designed to meet the specific needs of the tenant. Vehicle parking and truck maneuvering area at this site would accommodate the tenant’s needs.

Project Details

• 977 W 400 N, Ogden, UT
• 86,085 Square Feet

Project Managers

Aaron Austad Industrial Land Developer | The Boyer Company

Aaron Austad

Industrial

Cameron Cook Industrial Land Developer | The Boyer Company

Cameron Cook

Industrial